Episode 56 · The Facility

The Facility, Part 5: Inlet Facility and the East Riser

Episode 56: The Facility, Part 5: Inlet Facility and the East Riser, by Sankalp Thakur

A liquid slug arrives at three in the morning. Follow it through multiphase flow, risers, severe slugging, slug catchers, pig receivers and inlet manifolds. Hydrates, corrosion, metering, level control and high-integrity pressure protection show how a violent pipeline stream becomes a manageable plant feed. Part 5 of 16 in The Facility. Corran Point, its characters, companies and story figures are fictional and illustrative.

Listen to the show on your preferred podcast platform.

See it work

Explore the working principle

Inside this episode

  1. Cold open: the wall of liquid
  2. From the reservoir to the beach
  3. Risers: the vertical part of the journey
  4. Severe slugging and the four kinds of slug
  5. The slug catcher
  6. Pigs and the pig receiver
  7. Hydrates: ice that burns, and ice that kills
  8. The inlet manifold and knowing what is arriving
  9. The first separation step
  10. Two pressures that must never meet
  11. The riser valve and the shadow of Piper Alpha
  12. Wax, sand and the other passengers
  13. Nadia's question: what does Train C do to the front door?
  14. Lessons for a digital architect
  15. Recap and what comes next
← Explore all 96 episodes

Production credits & AI disclosure

Scripts generated with Claude Opus. Synthetic narration generated with Edge TTS. Reviewed, listened to, and approved by Sankalp Thakur.