Episode 58 · The Facility
The Facility, Part 7: Gas Dehydration

An export water-dew-point warning leads through the gas-drying train. Explore TEG contactors, lean-glycol purity, regeneration, stripping gas, losses and emissions, then molecular sieves for cryogenic service. Cooling-water assumptions and dew-point measurement connect process fundamentals to an off-spec export stream. Part 7 of 16 in The Facility. Corran Point, its characters, companies and story figures are fictional and illustrative.
Listen to the show on your preferred podcast platform.
Listen on Spotify ↗Listen on Apple Podcasts ↗Listen on Pocket Casts ↗Listen on Podcast Addict ↗Listen on Castbox ↗Listen on TuneIn ↗
See it work
Explore the working principle
Inside this episode
- Cold open: the phone call from the grid
- How much water can gas hold?
- Three ways to dry a gas
- The contactor: a waterfall the gas climbs through
- Regeneration: boiling the water back out
- What goes wrong: losses, foam and degradation
- Benzene in the steam
- Molecular sieves: crystal sponges with a temper
- Why wet gas eats pipes
- Longford: when the plant forgets what the cold can do
- Measuring dryness
- Optimising a unit that changes every day
- The investigation: wetter gas, or wetter glycol?
- The fix, and the cousin in Train C
- Lessons for a digital architect
- Recap and what comes next
Production credits & AI disclosure
Scripts generated with Claude Opus. Synthetic narration generated with Edge TTS. Reviewed, listened to, and approved by Sankalp Thakur.